Tuesday, November 23, 2010

Day 20 : Hw [B]

11/20/10 Saturday

1220 - 1240 AM

  • Set position
  • Saved as bedroom2.c4d
  • Scrapped the changes in bedroom2.c4d
145 - 245 AM
  • bedroom1.c4d reopened
  • Saved as bedroom1_1.c4d
  • Fixing weighting to the best of my ability
  • Reposition
  • Starting to animate each joint and i-k chains
  • Changed camera position
245 - 300 AM
  • Planning out the timing to the animation
  • Set to render
  • It took 8 hours and 30 minutes to render a 40 second clip 1,200 frames later
416 PM
  • Animation is complete
11/23/10 Tuesday

What Still Needs to be Done for Final:
  1. Possibly get more folies, ambience, sounds, and voiceovers 
  2. Compile sound files into Final Cut Pro
  3. Compile Video files into Final Cut Pro
  4. Edit the two together
Ideas for Tweaks:
  1. Add a light
  2. Add fabric texture
  3. Correct the collapse at the end of the animation
Things Needed to set up for DVD:
  1. Screen shots from each step of each project
  2. Background music
  3. Perhaps a commentary from myself
  4. Video Screen shots (if possible)
  5. Excerpts from my Animation blog
  6. Compress files into folders 

No comments:

Post a Comment